Quick Release Coupling is common in our daily life, especially the adjustable three rectangular transition joints, belongs to a kind of hydraulic transition joints, can adjust the direction, so in life's excavator and wheel loader, elevators and other heavy machinery hydraulic system often can see, but this kind of hydraulic fittings are very test installation technology, Once there is a mistake, it is easy to cause joint damage. Today, I'll show you how to install a Quick Release Couplingt.

Step 1:
There is a partial lock nut on the Quick Release Coupling. First, we should rotate to the left until it reaches the main gasket, then operate the upper O-ring in the same way, but rotate it to the far left.

Step 2:
Install the Quick Release Coupling on the oil head to be installed, but it is important to note that the wrench should not be used at this step but must be used by hand and adjusted at a later stage.

Step 3:

Use a wrench for this step and secure the nut. Since nuts need to be tightened, spanner should be used, and the torque should not be lower than the relevant regulations


Step 4:
When there are parts on the Quick Release Coupling, when we complete the previous step, fastening the nut with a wrench, we should pay attention to the joint should not turn together, otherwise even if the installation step is not completed successfully, the subsequent use will have adverse effects, so we must use a wrench or similar things to fix the joint.